Building work · London & South East CountiesLondon · Surrey · Sussex · Kent07904 404159
TOWIEASSOCIATES07904 404159Call

Service · Building work

Building work across London and the South East London · Surrey · Sussex · Kent

The kitchen’s been too small since the second child arrived. Or the wall between two rooms has always felt like it was in the wrong place. Building work starts with what you want to change and what the house will let you do.

TOWIE takes on building work across London and the South East counties: see the areas we cover. Still at the permissions stage? The planning guide is a good first read.

01What you’re seeing

When you need a builder,and what it usually means.

Most building enquiries start with something you’ve noticed, not a job title. Here’s what a few of the common ones usually point to.

The kitchen and the family have outgrown each other

Usually points to
An extension, or moving walls inside the footprint you already have. Both start with drawings. The second often needs no planning application at all.

A crack above a door that comes back every time it’s filled

Usually points to
Hairline cracks in new plaster are often shrinkage. One that reopens, widens or runs diagonally from the corner of a door or window can mean movement, and that wants a structural engineer’s eye before a builder’s.

Planning came through and the drawings are sitting in a drawer

Usually points to
You’re ready for building regulations drawings and prices. Check the date on the approval: most planning permissions lapse three years after they’re granted.

A damp patch low on a wall that comes back after painting

Usually points to
Often a path or flower bed built up above the damp-proof course, a leaking pipe or a blocked gutter, rather than the wall itself. The cause gets found before anything is repaired.

02Why it matters

Why it pays to planbefore anything’s dug.

Changes are cheapest on paper. Moving a doorway on a drawing costs an eraser. Moving it after the steel’s in costs a day, a skip and a conversation nobody enjoys.

Paperwork matters later too. Extensions, knock-throughs and loft rooms without a completion certificate tend to surface when you sell, usually at the worst possible moment in the chain.

And you’re probably living there. A job that’s planned properly has a start, a middle and an end, rather than a kitchen that’s been in the garage since spring.

Changes on paper

Every decision made before the first trench is one that can’t go wrong on site.

Certificates for the sale

Signed-off work is one less question from a buyer’s solicitor.

A finish date

Ordering, inspections and trades in the right sequence keep the end in sight.

House / side elevation

03Why a builder

Why structural workisn’t a weekend job.

Plenty of jobs around the house are fair game for a weekend. Structural work isn’t one of them, and the reasons are practical rather than snobbish.

Anything that touches the structure, the drains or the outside walls normally needs building regulations approval, with inspections at set stages. Getting those booked, passed and signed off is part of the job, and so is knowing what an inspector will want to see before the plasterboard goes up.

Then there’s the house next door. Work to a shared wall can bring in the Party Wall Act, with notice periods of one or two months. And your home insurer will usually want to know about major works before they start, not after a claim.

04Our process

How a building job runs,step by step.

Four stages, in this order, whatever the size of the job.

01

The conversation

What you want changed, the postcode, any drawings, and when you’d like it done. Photos on WhatsApp help.

02

Seeing the property

Nothing gets priced properly from a description alone. Access, the ground and the existing structure all show up on a visit.

03

Drawings and approvals

Planning if it’s needed, building regulations either way, and party wall notices where a shared wall is involved.

04

The build and the sign-off

Work in sequence, inspections booked at each stage, and the completion certificate at the end for you to keep.

05Aftercare

Looking after new workonce it’s finished.

New work takes a while to settle, and most of what people worry about in the first few months is normal.

Let new plaster dry

Fresh plaster can take several weeks to dry out fully. Paint it too soon, or with the wrong paint, and it peels. A thinned mist coat goes on first.

Expect hairline cracks

New timber and plaster shrink a little as the heating goes on for the first winter. Fine cracks along joints are common and get filled at the first redecoration.

Keep the air moving

A new extension holds a lot of water from the build. Open the trickle vents and run the extractor fans while it dries.

File the paperwork

Completion certificate, electrical certificate, any warranties on windows or roof. Keep them together with the deeds.

06Homes and businesses

Building work for homesand for businesses.

Building work on your home

Most people live in while the work goes on, so the useful questions are practical ones. Which room is out of action and for how long? Where does the kitchen go while the old one comes out? Is there a way in that doesn’t go through the hallway?

Say who lives there in your enquiry: young children, someone working from home, a dog that doesn’t like strangers. It changes how the job is organised.

Building work on business premises

A shop, office or workshop brings different questions. Does the landlord need to consent? Can the work happen while you keep trading, or out of hours? Fire safety law covers most commercial premises, so building regulations go through the full plans route, not a building notice.

Mention the use of the building and your opening hours when you get in touch.

07Cost

What affects the costof building work.

Nobody can give a fair price for building work without seeing the property, and a figure off the internet won’t match your house. What follows is what moves the number.

To talk through your own job, call 07904 404159.

Size and design

Floor area matters, but so does shape. A plain rectangle costs less per square metre than one with corners, roof lights and a vaulted ceiling.

Ground and foundations

Clay soils near trees often need deeper foundations. A building control inspector decides on the depth when the trench is open.

Access

No side or rear access means every bag, block and bucket of spoil goes through the house. That takes time.

The existing building

An older house can hide surprises: missing lintels, old repairs, chimney breasts removed without support. Allowing for them is better than pretending they won’t appear.

Materials and finish

Matching old brick, choosing bifold doors over a window, or tiling floor to ceiling all change the figure.

Fees around the build

Architect or designer, structural engineer, building control, and party wall surveyors where they’re needed.

Talk to us

Ready to get in touch about building work?

Call us, or send photos and a postcode on WhatsApp.

08Where

Building work in Londonand the South East.

Building work in London

London building work is shaped by tight plots and old houses. Victorian and Edwardian terraces, solid walls, timber floors and the odd chimney breast that came out without the right support years ago. Party walls on both sides are normal, and parking and skips need planning in their own right.

Every London borough has its own planning team, conservation areas and Article 4 directions. Our town pages for Croydon and Carshalton cover the detail.

Building work across the counties

Across Surrey, Sussex and Kent, each borough and district has its own planning team and its own way of reading the same national rules. Much of the countryside is Green Belt, and a lot of it sits on clay that moves as it wets and dries, which is why foundation depths change from one street to the next.

Put the postcode in your enquiry. Builders in Surrey and our town pages explain what changes from one council to the next.

09On site

What happens on the daywork starts.

The first morning of a building job sets the tone. Here’s what usually happens, so none of it is a surprise.

Skip and materials

A skip or grab lorry for spoil, and somewhere agreed for deliveries. If either sits on the road, the licence comes from Surrey County Council.

Protection

Floors and stairs covered, furniture moved out of the way, and dust sheeting or zip doors between the work and the rooms you’re still using.

Scaffolding if needed

Anything at height, from a roof to a gable, needs proper access up first.

Next door

A word with the neighbours about noise, parking and the skip goes a long way, especially on a terrace.

10Worth knowing

Knocking through:the wall that turns out to be holding something up.

Opening two rooms into one is one of the most common building jobs there is, and one of the easiest to get wrong. A lot of internal walls carry weight: floor joists, the wall above, sometimes part of the roof. In a Victorian terrace the middle “spine” wall often does all three.

Needles and props holding the wall while the steel goes in

How to tell if a wall is load-bearing

  • Floor joists upstairs run across the wall and rest on it, rather than running alongside it.
  • There’s another wall directly above it on the next floor.
  • It runs down the middle of the house, front to back, in an older property.
  • Don’t go by material. In older houses, timber stud walls can carry load too.

Why the obvious fix makes it worse

Knocking a hole and dropping in a lintel by eye might hold for a while. Then the ceiling above cracks, doors upstairs start to stick, and the steel that should have gone in at the start goes in anyway, with the plaster and decorating done twice. Without calculations and an inspection, there’s no completion certificate either.

How it’s done properly

  • A structural engineer sizes the beam and the supports at each end, and the calculations go to building control.
  • The wall above is held up on steel needles through the brickwork and adjustable props while the opening is cut.
  • The beam sits on padstones that spread the load into the walls or posts below.
  • The steel gets fire protection, usually plasterboard or intumescent paint, and building control inspects it before it’s boxed in.
  • If the beam bears on a party wall, a party wall notice goes to next door two months before.

11Before you call: guides

Where to start if youthink you need building work.

If you think you need building work but aren’t sure where to begin, these are the three questions to settle. Each guide takes about five minutes.

12FAQs

Building workquestions, answered.

How do I get a price for building work?

Send us a description of the work, the postcode and any drawings or photos, by the form, phone or WhatsApp. Building work needs to be seen before it can be priced properly, so expect a visit before a figure.

Do you work from an architect’s drawings?

If you have them, send them with your enquiry. If you don’t, say what you’d like to achieve and that can be talked through first.

Can I stay in the house while the work is done?

Usually, for most extensions and internal changes. Some stages, like a kitchen being moved or the electrics being off, are harder to live through than others, and it helps to plan around them.

Who arranges building control?

It has to be appointed before work starts, either the council or a registered approver. Agree who is booking it and the inspections before the job begins. The building regulations guide explains the routes.

How long does building work take?

That depends on the size of the job, the weather for anything outside, and material lead times. Permissions can add weeks or months before work begins. A clear brief makes it easier to give a realistic programme.

What if something unexpected turns up once the work starts?

Older houses especially can hide old repairs or missing supports. When it happens, the sensible order is to stop, look at what’s been found together, and agree the fix and any extra cost before carrying on.

Do I need to tell my home insurer about building work?

Usually, yes. Most policies ask to be told about major work before it starts. Check your policy wording or ring them.

Is scaffolding included?

It depends on the job. Our sister company is TOWIE Scaffolding, so ask about access when you enquire.

Which areas do you cover?

London and the South East counties: Surrey, Sussex and Kent, with Berkshire and Hampshire by arrangement. Put the property’s postcode in the form so the location can be checked.

Will the work need a party wall agreement?

If it involves a shared wall, a new wall on the boundary, or digging near next door’s foundations, probably. The party wall guide has the detail.

13Get in touch

Get in touch aboutyour building work.

A few lines about the job and a postcode is all it takes to start. Use the form, ring, or send photos on WhatsApp, whichever is easier.

Your project enquiry

Sister company of TOWIE Scaffolding, a Reigate firm since 2016. One team, one phone number.

WhatsApp us
Call usGet a quote