Knock-throughs
Load-bearing walls out, steel beams in, engineered and signed off.
TOWIE Builders · Renovations
The wall that splits the kitchen from the dining room. The tired house you bought for its street. A period home that needs bringing back without losing what made it worth buying.
TOWIE takes on structural alterations and full renovations, from a single steel beam to stripping a house back to brick.
01Renovations
The wall that splits the kitchen from the dining room. The tired house you bought for its street. A period home that needs bringing back without losing what made it worth buying.
Load-bearing walls out, steel beams in, engineered and signed off.
Lime mortars, matching materials and respect for the original fabric.
Back to brick, then rewired, replumbed and rebuilt.
Plastering, joinery and decorating to finish the job.
02The finish
Rooms with more light, more space and fewer compromises. The kind of finish worth paying a builder for.



Illustrative photos. Our own finished projects will replace them.
03Before you build
Taking out a load-bearing wall needs structural calculations from an engineer and building regulations approval. Most internal changes don’t need planning permission.
Listed buildings need listed building consent for work inside and out. In a conservation area, windows, doors and the outside of the house can need planning permission.
04How it works
Four stages, the same on every job.
What is load-bearing, what is original, and what is hiding behind the plaster.
Calculations, building regulations, and consent for listed buildings.
Props, steel, then the walls come out.
First fix, plaster, second fix, decorate.
05Price
Every quote is free. These are the things it depends on.
Size and number of steel beams and supports.
Old wiring, rotten timbers and damp found once walls open.
Specialist materials for period and listed buildings.
Working around a family takes more time than an empty house.
06Questions
Yes, with a steel beam designed by a structural engineer and signed off by building control.
Usually not, unless the building is listed. Building regulations still apply to structural work.
Often, in stages. It depends on the job and how much of the house is affected.
With listed building consent in place first.
07Get in touch
Tell us what you’re planning and when. A postcode and a line about the job is enough to start.
Sister company of TOWIE Scaffolding, a Reigate firm since 2016. One team, one phone number.